Example sentences of "the lead time " in BNC.
Next pageNo | Sentence |
---|---|
1 | Using lean production , the authors found the Japanese required just over half the engineering time , half the number of people , and only two-thirds the lead time as their European rivals to produce similar cars . |
2 | The new computerised processes have meant that the lead time in certain product areas has been shortened dramatically from eight weeks to 42 h . |
3 | Retention of the present format , including a reserve day for each round up to the final and the retention of the lead time between rounds played in midweek . |
4 | In well ordered systems it may be possible to calculate the length of in-house experience required to achieve the required level of expertise in particular topics and compare this with the lead time for particular product requirements . |
5 | Overall , the lead time involved is something like 50 years , a figure that has not shortened appreciably throughout history . |
6 | This can shorten the lead time , but to be effective it must be accompanied by the correct information processing pattern . |
7 | The lead time between an order and a delivery is an important aspect of stock control . |
8 | The lead time as shown is the time taken between the order being made and the delivery taking place . |
9 | The lead time between a product 's conception and launch is a measure of a company 's responsiveness to changing conditions — if unnecessary delays result from cumbersome development procedures , the products will arrive with an in-built obsolescence . |
10 | The lead time , although prolonged , is not unusual in the world of contracts when extensive development work is necessary . |
11 | However , such notice is usually longer than the lead time that the seller requires to fulfil an order . |
12 | This is because until the commencement of the lead time period , the seller has probably not started work on the order , and so has incurred no expense . |
13 | Once the erm drop tanks have been developed and have entered production in most of the lead time one associates with providing a capability has er has actually been avoided so we could re-order probably within a year . |
14 | the lead time by tightening up and this is where your time deliveries come in . |