Example sentences of "[be] [verb] [v-ing] [noun] [num] " in BNC.

  Next page
No Sentence
1 to Close an SPR , it must already have been accepted using option 3.4.0 or 3.8.0 and may not have been closed already via another SSR
2 to Close an SPR , it must already have been accepted using option 3.4.0 or 3.8.0 and may not have been closed already via another SSR
3 The package manager may only be changed when the package has been approved or after the DCs have been aborted using option 2.7.0 — Abort DC .
4 This unit will not be accessed by LIFESPAN until its details have been updated using option 9.4.0 .
5 The Product can only be registered if a known Product package and Package version have been entered using option 5.1.2 — Update Product .
6 Media Types must be in the range 1 to 10 and these must previously have been introduced using option 9.5.0 — Update Media Types .
7 Media Types must be in the range 1 to 10 and these must previously have been introduced using option 9.5.0 — Update Media Types .
8 To check that an offline run can be performed , submit a package to be offlined using option 9.1.0 , Request Package to be Offlined .
9 For Offline ‘ stores ’ , two methods can be used to generate an offline workload : either by specifying packages to be offlined using option 9.1.0 , or by using the Storeman facility , whereby a range of modules which have not been accessed in a given time period can be offlined .
10 The pmodel module must then be installed using option 7.3.1 — Install/Deinstall Process Models ( you must have process model operations privilege for this ) .
11 The scheduling of subsequent offline runs can be automated using option 9.2.0 , which allows the user to specify an interval between offline runs .
12 The current holder of the SPR can be seen using option 3.7.1 — View One SPR .
13 A list of all SPRs can be displayed using option 3.7.2 — View All SPRs .
14 A list of all SPRs can be displayed using option 3.7.2 — View All SPRs .
15 A list of all SPRs can be displayed using option 3.7.2 — View All SPRs .
16 This will generate an ‘ Offline Workload ’ , which can be displayed using option 9.8.0 .
17 A list of all DCs can be displayed using option 2.8.5 — View DC Titles .
18 A list of all DCs can be displayed using option 2.8.5 — View DC Titles .
19 A list of all DCs can be displayed using option 2.8.5 — View DC Titles .
20 The resolution of this problem can be demonstrated using Figure 8.3 .
21 A Design Change can be aborted using option 2.7.0 , Abort DC , if , for example , it refers to the wrong module or it has been activated through the wrong package .
22 The reason for this may be understood using Figure 17–2 .
23 Media units can be entered using option 9.4.0 .
24 Media items can be entered using option 9.3.0 .
25 A module 's part number may be viewed using option 1.7.1 — View Module Details or via LIFESPAN RDBI , and may be updated using option 1.8.0 — Update Module Details .
26 If it has just been created using option 2.1.1 — Create DC , it should now be updated using option 2.1.2 — Update DC and then submitted for assessment using option 2.1.3 , whereupon no further changes will be possible .
27 Packages should be updated using option 1.3.4 — Edit Package Contents .
28 The fault media item can be physically inspected and , if it is found to be usable , its state can be updated using option 9.3.0 to make it available to LIFESPAN .
29 Media types can be defined using option 9.5.0 .
30 Once a DC has been agreed , it should be activated using option 2.4.0 — Activate DCs which allows the modules on the DC to be modified .
  Next page