Example sentences of "is [verb] [prep] the [num ord] [coord] " in BNC.

  Next page
No Sentence
1 The method involves calculating two half-slopes : the left-hand half-slope is calculated between the first and the middle summary point , and the right-hand half-slope between the middle and the third point .
2 However , it loses the contrast that is developed in the fourth and fifth paragraphs in English : ‘ There are others …
3 The auricular surface ( articulating with the ilium ) is limited to the first and second sacral vertebrae in the female , but in the male it often extends to the middle of the third vertebra .
4 Three instruction formats are used ; a 1-byte format with just an operation code ( for example " clear accumulator " ) , a 2-byte format with an operation code and a 1-byte operand field ( for example " load into accumulator the value in the second byte of the instruction " ) , and a 3-byte format with an operation code and a 2-byte operand field ( for example " load into accumulator the contents of the byte whose address is given by the second and third bytes of the instruction " ) .
5 Hermeneutics is committed to the first and hence to giving some account of how internal orderings relate to reality .
6 For reasons of classification and sample size , not all the headings in Tables 3.1 and 3.2 are comparable , and law is omitted from the first and medicine from the second .
7 Many Clubs have some twin rooms into which three or four beds can be fitted and in the majority of cases , a price reduction is offered for the third and/or fourth person sharing .
8 But , before you do , wait to see what is proposed around the 19th and then again on the 24th , because the chances are that someone will feel embarrassed and may even offer you the earth when all you wanted was an apology .
9 The same procedure is followed on the second and top wires , the latter taking a bigger load than the first two .
10 The Treaty on the Final Settlement with respect to Germany is signed at the fourth and final two-plus-four session in Moscow [ pp. 37717-18 ; 37834 ] .
11 Evaluation is identified as the fourth and final style of the planning cycle but it is emphasised that evaluation is not simply something that comes as a ‘ big bang ’ at the end of the process , but that it is required throughout .
  Next page